IT Equipment Power Consumption (Watt, kWh), PUE & Electricity Cost Calculator
Calculate daily, monthly, and annual kWh energy usage, data center PUE overhead, monthly electricity bills, 220V MCB amperage, and BTU/hr heat load.
Input Parameters
Calculation Results
- Pure IT Equipment Power Load
- 850 Watts
- Total Facility Power (Including PUE)
- 1,190 Watts
- Cooling & UPS Overhead Power
- 340 Watts
- Daily Electrical Energy Consumption
- 28.56 kWh
- Monthly Electrical Energy Consumption (30d)
- 856.8 kWh
- Annual Electrical Energy Consumption (365d)
- 10,424.4 kWh
- Estimated Monthly Electricity Bill
- 1,237,819 IDR
- Estimated Annual Electricity Bill
- 15,060,131 IDR
- Estimated Current Draw at 220V (PF 0.95)
- 5.69 Amperes
- Recommended MCB Breaker Rating (+25% Margin)
- 10 Amperes
- Thermal Heat Dissipation Output
- 2,900 BTU/hr
- Recommended Minimum AC Cooling Capacity
- 0.5 PK
Isolate management, server, user, and IoT/CCTV traffic into dedicated 802.1Q VLANs.
| Facility & Cooling Scenario | PUE Factor | Monthly Energy (kWh) | Estimated Monthly Electricity Bill | Estimated Annual Electricity Bill |
|---|---|---|---|---|
| Perangkat IT Saja (Tanpa Pendingin/UPS, PUE 1.0) | 1 | 612 kWh | 884,156 IDR | 10,757,236 IDR |
| Ruang Server Efisien + Inverter AC (PUE 1.4) | 1.4 | 856.8 kWh | 1,237,819 IDR | 15,060,131 IDR |
| Ruang Server Standar On-Premise (PUE 1.6) | 1.6 | 979.2 kWh | 1,414,650 IDR | 17,211,578 IDR |
| Ruang Server Legacy / Non-Inverter (PUE 2.0) | 2 | 1,224 kWh | 1,768,313 IDR | 21,514,472 IDR |
How to Use This Tool
- Enter the total active IT equipment power load (servers, switches, routers, NAS) in Watts and set the PUE factor (1.0 for hardware only, or 1.4–1.8 including cooling and UPS).
- Specify the daily operating hours (1 to 24 hours) and the electricity tariff per kWh in IDR (e.g., 1444.70 or 1699.53).
- Review the daily/monthly/annual kWh consumption, estimated electricity bill, 220V current draw and MCB breaker sizing, and thermal heat dissipation in BTU/hr.
Worked Example: On-Premise 850W Server Rack + Cooling (PUE 1.4, 24/7)
Worked example: An 850-Watt IT rack with a PUE of 1.4 (1,190 W total facility load) running 24/7 at IDR 1,444.70/kWh consumes 28.56 kWh/day (856.8 kWh/month), costing IDR 1,237,819/month and emitting 2,900 BTU/hr of heat.
- Total IT Equipment Power Load (Watts)
- 850 Watts
- Facility PUE Factor (1.0 = Hardware Only)
- 1.4
- Daily Operating Hours (1–24h)
- 24 Jam
- Electricity Tariff per kWh (IDR/kWh)
- 1,444.7 Rp/kWh
- Pure IT Equipment Power Load
- 850 Watts
- Total Facility Power (Including PUE)
- 1,190 Watts
- Cooling & UPS Overhead Power
- 340 Watts
- Daily Electrical Energy Consumption
- 28.56 kWh
- Monthly Electrical Energy Consumption (30d)
- 856.8 kWh
- Annual Electrical Energy Consumption (365d)
- 10,424.4 kWh
- Estimated Monthly Electricity Bill
- 1,237,819 IDR
- Estimated Annual Electricity Bill
- 15,060,131 IDR
- Estimated Current Draw at 220V (PF 0.95)
- 5.69 Amperes
- Recommended MCB Breaker Rating (+25% Margin)
- 10 Amperes
- Thermal Heat Dissipation Output
- 2,900 BTU/hr
- Recommended Minimum AC Cooling Capacity
- 0.5 PK
| Facility & Cooling Scenario | PUE Factor | Monthly Energy (kWh) | Estimated Monthly Electricity Bill | Estimated Annual Electricity Bill |
|---|---|---|---|---|
| Perangkat IT Saja (Tanpa Pendingin/UPS, PUE 1.0) | 1 | 612 kWh | 884,156 IDR | 10,757,236 IDR |
| Ruang Server Efisien + Inverter AC (PUE 1.4) | 1.4 | 856.8 kWh | 1,237,819 IDR | 15,060,131 IDR |
| Ruang Server Standar On-Premise (PUE 1.6) | 1.6 | 979.2 kWh | 1,414,650 IDR | 17,211,578 IDR |
| Ruang Server Legacy / Non-Inverter (PUE 2.0) | 2 | 1,224 kWh | 1,768,313 IDR | 21,514,472 IDR |
Core Concept & Engineering Notes
How It Was Calculated (Formulas & Steps)
Mathematical Formulas
- Total Facility Power (Watts) = IT_Equipment_Watts × PUE_Factor
- Daily Energy Consumption (kWh) = (Total_Facility_Watts × Daily_Hours) ÷ 1,000
- Monthly Electricity Cost (IDR) = Daily_kWh × 30 days × Tariff_per_kWh
- Thermal Heat Dissipation (BTU/hr) = IT_Equipment_Watts × 3.41214
Step-by-Step Calculation
- Beban Perangkat IT = 850 Watt, Faktor PUE = 1.4 → Total Daya Fasilitas = 850 × 1.4 = 1190 Watt.
- Konsumsi Energi Harian (24 jam/hari) = (1190 W × 24 jam) / 1000 = 28.56 kWh/hari.
- Konsumsi Bulanan (30 hari) = 856.8 kWh/bulan | Tahunan (365 hari) = 10424.4 kWh/tahun.
- Estimasi Tagihan Listrik Bulanan (Tarif Rp 1.444,7/kWh) = Rp 1.237.819/bulan (Rp 15.060.131/tahun).
- Disipasi Panas Rak IT = 850 W × 3,412 = 2.900 BTU/jam (Rekomendasi Pendingin: minimal 0.5 PK).
Frequently Asked Questions (FAQ)
What is PUE (Power Usage Effectiveness) and how should I choose its value?
If you only want to calculate the direct electricity draw of a single device or server excluding room air conditioning, set PUE = 1.0. To estimate total server room cost including inverter AC cooling and UPS losses, use 1.4 to 1.6.
Why is a server's actual power draw lower than its PSU nameplate rating (e.g., an 800W PSU)?
An 800W PSU label indicates maximum peak output capacity. Under typical production utilization (20%–40% CPU load), a dual-PSU server rated at 800W usually draws 180W to 320W at the wall.
How do you convert server wattage into air conditioner cooling capacity (BTU/hr and PK)?
Multiply the IT load in Watts by 3.412 to obtain heat dissipation in BTU/hr. A 1 PK (horsepower) air conditioner provides roughly 9,000 BTU/hr of cooling. Production server rooms should deploy redundant N+1 cooling units.
Why should the MCB circuit breaker be sized 25% above continuous operating current?
Per electrical safety codes (NEC / PUIL), circuit breakers supplying continuous loads for more than 3 hours must not exceed 80% of their rated ampacity (requiring a 1.25× sizing multiplier) to prevent nuisance thermal tripping.
Related Calculators
View All General Tools →Calculate server UPS capacity (kVA/VA), VRLA battery runtime (Ah), and 24/7 monthly electricity cost with 25% safety margin and power factor.
Calculate server room heat dissipation in BTU/hr, convert to air conditioning PK ratings with 24/7 redundancy, and size server racks with airflow buffer.
Calculate maximum allowed daily, monthly, and yearly downtime from SLA targets (99.9%–99.999%) or audit achieved SLA from observed incident duration.
Convert accurately between manufacturer decimal SI units (KB, MB, GB, TB, PB) and operating system binary IEC 80000-13 units (KiB, MiB, GiB, TiB, PiB).
Calculate file transfer duration, offsite backup windows, and effective throughput (Mbps, MB/s, MiB/s) accounting for TCP/IP protocol overhead.
Generate formal User Acceptance Testing (UAT) checklists and project commissioning handover (BAST) documentation for enterprise IT deployments.
References & Notes
- ISO/IEC 30134-2 — Information technology — Data centres — Key performance indicators — Part 2: Power usage effectiveness (PUE)
- ASHRAE TC 9.9 — Thermal Guidelines for Data Processing Environments
Note: Results above are mathematical estimates based on standard formulas. Always verify against official vendor documentation and site conditions before production deployment.