IT Project UAT Checklist & Handover BAST Generator
Generate formal User Acceptance Testing (UAT) checklists and project commissioning handover (BAST) documentation for enterprise IT deployments.
Input Parameters
Calculation Results
- IT Project Deployment Scope
- full_infrastructure
- Tested Endpoints Count
- 24
- Total UAT Checklist Items
- 5
- Acceptance Criteria Target SLA
- 99.5%
- Required Retention Duration
- 30 Days
Isolate management, server, user, and IoT/CCTV traffic into dedicated 802.1Q VLANs.
| Test Code | Category | Field Testing Procedure | Pass Criteria | Test Result Status |
|---|---|---|---|---|
| UAT-01 | Fisik & Perkabelan (TIA-568) | Uji kontinuitas, wiremap pin 1–8, dan pelabelan TIA-606 pada 24 titik tarikan kabel | 100% Pass Fluke/LAN Tester & Label Terpasang | LULUS (PASS) |
| UAT-02 | Jaringan & Switching PoE | Uji negosiasi link Gigabit (1000Mbps), isolasi VLAN, dan suplai tegangan PoE 802.3af/at | Packet Loss 0%, Tegangan PD >= 44V DC | LULUS (PASS) |
| UAT-03 | Redundansi & Failover | Simulasi cabut link ISP utama / pemutusan daya PLN untuk uji failover otomatis & UPS | RTO Failover < 5 Detik, Target SLA 99.5% | LULUS (PASS) |
| UAT-04 | Penyimpanan & Rekaman | Verifikasi penulisan disk NVR / ZFS Pool dan estimasi retensi penyimpanan 30 hari | Status SMART/Pool ONLINE, Retensi >= 30 Hari | LULUS (PASS) |
| UAT-05 | Keamanan & Dokumentasi Serah Terima | Perubahan password default, penutupan port WAN tidak terpakai, dan penyerahan denah/topologi | Skor Audit Hardened & Dokumen As-Built Diserahkan | LULUS (PASS) |
====================================================================
BERITA ACARA UJI FUNGSI (UAT) & SERAH TERIMA PEKERJAAN
====================================================================
Lingkup Proyek : FULL_INFRASTRUCTURE
Jumlah Titik/Unit : 24 Unit Terinstalasi
Standar Kelayakan : Target SLA 99.5% | Retensi Data 30 Hari
--------------------------------------------------------------------
Berdasarkan hasil pengujian bersama di lapangan terhadap seluruh
parameter fisik, konektivitas jaringan, beban daya UPS, serta sistem
keamanan perangkat, maka pekerjaan dinyatakan telah berfungsi 100%
sesuai spesifikasi teknis (LULUS UJI FUNGSI / ACCEPTED).
Pihak Pelaksana Teknis Pihak Pemberi Kerja / Klien
(__________________________) (__________________________)
====================================================================How to Use This Tool
- Select your deployment project scope (Network & Wi-Fi, CCTV Surveillance, Server Virtualization, or Full Enterprise Infrastructure), endpoint density, and target SLA.
- Review the structured 5-pillar UAT checklist matrix complete with test codes, standard testing procedures, pass/fail acceptance thresholds, and result statuses.
- Copy the generated formal Commissioning Handover Document (BAST) template formatted with signature endorsements for contractor leads and client project directors.
Worked Example: Full Infrastructure Commissioning 24 Endpoints (99.5% SLA, 30-Day Retention)
Computed example: A Full Enterprise Infrastructure deployment spanning 24 endpoints targeting a 99.5% SLA yields a comprehensive 5-pillar verification checklist and an authoritative BAST commissioning handover document with formal dual-party endorsement fields.
- Project Scope of Work
- Full Enterprise Infrastructure (Turnkey)
- Total Endpoint Node Count
- 24
- Target Availability SLA Commitment
- 99.5 %
- Required Storage Retention Period
- 30 Days
- IT Project Deployment Scope
- full_infrastructure
- Tested Endpoints Count
- 24
- Total UAT Checklist Items
- 5
- Acceptance Criteria Target SLA
- 99.5%
- Required Retention Duration
- 30 Days
- Material Requirement Summary (Copy-Ready)
- ==================================================================== BERITA ACARA UJI FUNGSI (UAT) & SERAH TERIMA PEKERJAAN ==================================================================== Lingkup Proyek : FULL_INFRASTRUCTURE Jumlah Titik/Unit : 24 Unit Terinstalasi Standar Kelayakan : Target SLA 99.5% | Retensi Data 30 Hari -------------------------------------------------------------------- Berdasarkan hasil pengujian bersama di lapangan terhadap seluruh parameter fisik, konektivitas jaringan, beban daya UPS, serta sistem keamanan perangkat, maka pekerjaan dinyatakan telah berfungsi 100% sesuai spesifikasi teknis (LULUS UJI FUNGSI / ACCEPTED). Pihak Pelaksana Teknis Pihak Pemberi Kerja / Klien (__________________________) (__________________________) ====================================================================
| Test Code | Category | Field Testing Procedure | Pass Criteria | Test Result Status |
|---|---|---|---|---|
| UAT-01 | Fisik & Perkabelan (TIA-568) | Uji kontinuitas, wiremap pin 1–8, dan pelabelan TIA-606 pada 24 titik tarikan kabel | 100% Pass Fluke/LAN Tester & Label Terpasang | LULUS (PASS) |
| UAT-02 | Jaringan & Switching PoE | Uji negosiasi link Gigabit (1000Mbps), isolasi VLAN, dan suplai tegangan PoE 802.3af/at | Packet Loss 0%, Tegangan PD >= 44V DC | LULUS (PASS) |
| UAT-03 | Redundansi & Failover | Simulasi cabut link ISP utama / pemutusan daya PLN untuk uji failover otomatis & UPS | RTO Failover < 5 Detik, Target SLA 99.5% | LULUS (PASS) |
| UAT-04 | Penyimpanan & Rekaman | Verifikasi penulisan disk NVR / ZFS Pool dan estimasi retensi penyimpanan 30 hari | Status SMART/Pool ONLINE, Retensi >= 30 Hari | LULUS (PASS) |
| UAT-05 | Keamanan & Dokumentasi Serah Terima | Perubahan password default, penutupan port WAN tidak terpakai, dan penyerahan denah/topologi | Skor Audit Hardened & Dokumen As-Built Diserahkan | LULUS (PASS) |
Core Concept & Engineering Notes
How It Was Calculated (Formulas & Steps)
Mathematical Formulas
- 5-Pillar Commissioning: Physical Layer, Switching & PoE, Redundancy & Failover, Storage Retention, and Security Hardening
- Cabling Acceptance: 100% Pass on Fluke/LAN tester & TIA-606 label compliance
- PoE Delivery Acceptance: Zero packet loss, PD DC Voltage >= 44V
- 100% BAST Signoff: All UAT checklist parameters Pass and As-Built drawings delivered
Frequently Asked Questions (FAQ)
What is the fundamental difference between UAT and BAST in IT contracting?
UAT represents the empirical technical testing worksheet executed jointly on site. BAST is the formal legal certificate of acceptance confirming scope completion, serving as the legal prerequisite for final financial disbursement and warranty commencement.
Why is live UPS failover simulation mandatory within commissioning checklists?
New UPS battery strings must be validated under actual live load. Simulating a sudden AC utility blackout confirms inverter transfer times remain under 10 milliseconds, preventing server power supplies from dropping voltage and rebooting.
What supporting documentation must accompany the signed project BAST?
Mandatory annexes include: Fluke cable test reports, final As-Built network topology schematics, physical floorplan placement blueprints, encrypted administrative credential rosters, and manufacturer distributor warranty certificates.
How are failed or non-compliant UAT checklist items handled?
Failed test items are documented on a formal Punch List / Defect Log. The contractor is granted a rectification window (typically 7–14 business days) to resolve the defect prior to final dual-party 100% BAST execution.
Related Calculators
View All General Tools →Print-ready ANSI/TIA-606-C cable wrap, patch panel strip, and asset QR tag generator for standardized, enterprise-grade structured cabling.
Visualizer for TIA-598C fiber optic color codes from 1 to 288 cores, tube mapping, and RJ45 LAN pinout diagrams (T568A/T568B) with PoE pairing.
Estimate CCTV installation material Bill of Materials (BOM): Cat6 UTP cable boxes, RJ45 modular plugs, junction boxes, conduit pipes, and cable ties.
Plan server maintenance windows across WIB, WITA, WIT, SGT, and UTC timezones with automated cron backup conflict detection and change notice.
References & Notes
- ISO/IEC/IEEE 29119-3:2021 — Software and Systems Engineering: Test Documentation Standards
- ISO/IEC/IEEE 15288:2015 — Systems and Software Engineering: System Life Cycle Processes (Validation & Transition)
- Project Management Institute (PMI) — A Guide to the Project Management Body of Knowledge (PMBOK Guide)
Note: Results above are mathematical estimates based on standard formulas. Always verify against official vendor documentation and site conditions before production deployment.